Key Information
- Rotation: Counter -Clockwise (looking from shaft end)
- 1” Diameter 15T SAE B-B splined shaft
- SAE B 4 hole mounting flange
- Front Pump displacement: 36 cc/rev (36L/Min per 1000 rpm)
- Middle Pump displacement: 19 cc/rev (19L/Min per 1000 rpm)
- Rear Pump displacement: 16 cc/rev (16L/Min per 1000 rpm)
Replaces the following JCB part numbers
Weight
Machine Fitment
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 541-70M MILITARY 9812/7250
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 541-70 SWAY TIER 2 9812/7060
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 536-70 9812/7075
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 541-70 TIER 2 9812/7060
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 541-70 Tier 3 9812/7300
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 531-70 SWAY TIER 2 9812/7060
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 535-95 SWAY Tier 2 9812/7000
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 535-95 Tier 3 9812/7085
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 531-70 TIER 2 9812/7060
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN .536-70 9812/7075
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 531-70 Tier 3 9812/7300
- PUMP,(THREE STAGE) MAIN HYDRAULICS 80 L/MIN 535-95 Tier 2 9812/7000
- PUMP,(THREE STAGE) MAIN HYDRAULICS,AGS 125 L/MIN 535-95 Tier 3 9812/7085
- PUMP/MOTOR INSTALLATION ASSEMBLIES 3 STAGE, 80L/MIN 535-95 9822/0575
- PUMP/MOTOR INSTALLATION ASSEMBLIES 3 STAGE 531-70WM 9822/0090
- PUMP/MOTOR INSTALLATION ASSEMBLIES 3 STAGE 536-70AG+ 9822/0090
- PUMP/MOTOR INSTALLATION ASSEMBLIES 3 STAGE 541-70WM ALL 541-70 MODELS 9822/0090
- PUMPS GEAR 3 STAGE 536-70AG+ 9822/0090
- PUMPS GEAR 3 STAGE 531-70WM 9822/0090
- PUMPS GEAR 3 STAGE 536-60DS 9822/0090
- PUMPS GEAR 3 STAGE 541-70WM ALL 541-70 MODELS 9822/0090
We dispatch all of our items on the same day they are purchased, providing the purchase is made before 1pm and the item is in stock.
We send our products worldwide via a wide range of couriers to provide you, the customer, with the best price and service.